Hi,
Up todas I have never play with these type of programs.
To start with, I have created a very simple layout to start knowing how all the trainz issues work. The layuot is compsed of a doble oval and large line with two stationery in the laterals. I have included there trains, one in every direction and one bidirectional. I ran trains to check all junciones work.
From this point all are doubts. The next step is:
a) how to include signals that change under specific conditions (a track is ocopied ot not, a junction is in a specific posición... Etc.)
b) how to Intruct to a driver that should follow the signals.
Any sugestion to continue?
An important issue, I understatand English lenguaje but please, use simple words and don't slang.
Think you in advance
Up todas I have never play with these type of programs.
To start with, I have created a very simple layout to start knowing how all the trainz issues work. The layuot is compsed of a doble oval and large line with two stationery in the laterals. I have included there trains, one in every direction and one bidirectional. I ran trains to check all junciones work.
From this point all are doubts. The next step is:
a) how to include signals that change under specific conditions (a track is ocopied ot not, a junction is in a specific posición... Etc.)
b) how to Intruct to a driver that should follow the signals.
Any sugestion to continue?
An important issue, I understatand English lenguaje but please, use simple words and don't slang.
Think you in advance