I am building a British route and although much still to do thought I would put signals in at the main stations with multi platforms. Obviously I need signals at the end of each platfor exit onto the main line but that is fine when I am putting a signal at the start on the left but thesubsequent one flicks to the right and it won't sit on th left of the track. Is this something to do with me having two lots of double tracks going out the terminal or through station? Do I need to relay them as singles track instead - if you are following me right?!