hangarflying
New member
Hello everyone,
I am new here, first time post. I am using 2009 world builders edition.
I'm playing with surveyor trying to figure it out. I'm doing a logging scene using narrow gauge track. I've made the hills and put in the track. At the bottom I have a lumber mill.
Ok, my issue is that I want the logs to be brought in with the narrow gauge, but the product taken away with standard track. There isn't a problem with the "lumber" side, I can hook the track up with no issue. The wood chips are on the same side as the logs drop off, so when I attach the narrow track, I would not be able to get at the wood chips with the standard track. Is there a way to make this work?
If not is there a way to change over the track into another type without deleting each segment of track?
Thanks for your help!
James
I am new here, first time post. I am using 2009 world builders edition.
I'm playing with surveyor trying to figure it out. I'm doing a logging scene using narrow gauge track. I've made the hills and put in the track. At the bottom I have a lumber mill.
Ok, my issue is that I want the logs to be brought in with the narrow gauge, but the product taken away with standard track. There isn't a problem with the "lumber" side, I can hook the track up with no issue. The wood chips are on the same side as the logs drop off, so when I attach the narrow track, I would not be able to get at the wood chips with the standard track. Is there a way to make this work?
If not is there a way to change over the track into another type without deleting each segment of track?
Thanks for your help!
James