Ive decided to relocate a few hundred K's north from my last route and start work on some of the northern NSW lines. They will be TransDEM based and built in TS2006 but should import into '9' or '10'.
The first will be the Murwillumbah branch which branches off the North Coast Line at Casino.
Stage 1 will be Casino to Lismore and this should be on the DLS in a day or so.
Stage 2 will be Lismore to Byron Bay.
Stage 3 will be Byron to Murwillumbah.
Stage 4 will possibly be the branch to Ballina.
Thanks to DiRICo for copies of his rail diagrams. NSWRail.net for general information and all content creators.

Uploaded with ImageShack.us
PG.
The first will be the Murwillumbah branch which branches off the North Coast Line at Casino.
Stage 1 will be Casino to Lismore and this should be on the DLS in a day or so.
Stage 2 will be Lismore to Byron Bay.
Stage 3 will be Byron to Murwillumbah.
Stage 4 will possibly be the branch to Ballina.
Thanks to DiRICo for copies of his rail diagrams. NSWRail.net for general information and all content creators.

Uploaded with ImageShack.us
PG.