In the media great play has been made of simulating a proposed brand new passenger line from London with a divide to Glasgow and Eidnburgh. With 200MPH trains Machester could be reached from London in 45 minutes and glasgow just several mintes over 2 hours! The estimate is billlions of course as these lines would be seperate from the existing ones and more frequent. The planners see it as something after the present credit crunch. However whether it will ever happen is another question?!