I am having a bit of a problem with trains using navigate to trackmark in yards. The I cant get past the last signal before the yard. The red signal says line is unsignaled. I dont want to put a thousand signals in the yard. Thanks
 
I have got around this by using invisible signals in my yards. Its called Signal Thingy Right (Invisible),<kuid:93677:1400> on the DLS

Andy
 
Set the points in the yard so that the first signal can see another signal or track end further down the line. Once it passes the problem signal it should be fine so long as you don't put loads of signals all over the yard. :wave:
 
PON_Dwarf_Signal_USA_L02_Permissive,<kuid:522774:100020>
PON_Dwarf_Signal_USA_02_Permissive,<kuid:522774:100021>
 