MBTA Providence/Stoughton Line

susanaes

NYCTA Developer
Ok so Ive started a MBTA Providence/Stoughton Line and here's a pic more on the way when im done with South Station but i dont get why my Acela does this:
Screen_014-1.jpg
 
Go to Surveyor Menu/Performance Settings and move the Polycount slider all the way to the right. Chances are that will fix it.
 
Thank you JRT. I was looking for Susan and it didn't register that the thread was being hijacked...or susan has aliases. In any case I have no idea about that problem.
 
Why i have a request if any one would like to help me with Route could you do Back Bay to Forest Hills for me please your help would be grateful thank you please post answer/ comments here please thank you.:)
 
I'm have been working on my mbta route for over 2 years now using the 1km baseboards. I work on it at my spare time since I am an architecture student. If anyone would like, I can send you my version of the route.

Here is what I've done so far:
Commuter Rail: South Station - Forge Park/495
Red Line:Central - Broadway (JFK/UMass - Ashmont/Braintree on serperate route)
Green Line: Science Park - Kenmore
E Branch (to Longwood Medical Area)
Orange Line: Forest Hills to North Station
 
If you could email me your Forge Park Route.. I live in Norwood and work for the MBTA everyday.. so I know that route by heart..
 
My South Station isn't done yet but im getting a head of my self but anyway if anyone has stuff i could use for BB(Back Bay) please send it to me your contribution will be well appreciated thank you.:)
 
Last edited:
ah nice to see this undertaken , hope the 42 miles isnt too much from Boston to Providence. The Tower 1 Interlocking and the Southampton Yard/LOOP interlocking outside of South Station is probably the hardest part of the route to undertake. If you need help just let me know since i have been in the head end many times for this stretch and i actually live down the street from it.

Interlockings:
COVE (Near Back Bay)
PLAINS (North (well East of in RR Terms) of Forest Hills)
FOREST (Sotuh (West) of Forest Hills)
READ (East of Readville)
TRANSFER (West of Readville and at the south end of Readville Yard)
JUNCTION (just east of Canton Junction)
MANSFIELD (Just west of Mansfield and includes the Framingham Secondary east of the station on Track 1)
HOLDEN (East of Attleboro, 2 to 4 tracks)
BORO (east of Attleboro closer to the station , track 4 only to the CSX Middleboro Secondary)
THACHTER (4 to 3 tracks west of Attleboro , Tracks 3 and 1 only)
EAST JUNCTION (Track 4 only near the old layover yard)
HEBRONVILLE (3 to 2 Tracks , west of Attleboro)
LAWN (West of South Attleboro after the PW (Track 7) has joined and right next to where I95 starts paralleling the tracks)
PAWTUCKET (Tracks to the New Layover Facility and Amtrak Providence MoW base)
ORMS (Just east of Providence station, 2 to 5 tracks)
ATWELLS (5 to 2 tracks) West of the Providence station (Currently the end of the line until a few months from now)

With the new extension on towards T.F Green Airport , Wickford Junction and Kingston RI with a possiblility of Westerly RI.

BRAYTON
CRANSTON
"POST" (New Under Construction near the airport station)
PACKARD
MALCOM
DAVISVILLE
KINGSTON
HIGH ST.

Mainline goes like this:

| Inbound (Track 2) | Outbound (Track 1) |

Any addition tracks on the Track 1 side have odd numbers (3,5,7,9 etc ....) and any additional tracks on the Track 2 side have even numbers (4,6,8 etc...)
 
Last edited:
Good news, I'm going to work on the Forge Park Route.. I will clean it up for you all.. since there a lot of good work but a lot of flaws.. I'm going to see if I'm going to use Trainz 2006 or Trainz 2010 (Which) isn't really working..

Also, I'm going to change the signal problems in the route.. because their too basic. Also, some of the platforms need a lot of work.. But overall he did a great job..
 
im working on a mega route right now but ill get back to ya on that when im not as busy (track at MP 47 right now/ Scenery up to MP 45)

@Inn cool now we just need to figure out how to signal the diamond of the forge park line and the CSX Framingham Secondary / QBF 8
 
Are you referring to Walpole Station? I gotta look up the diagram.. err when I head in on Tuesday, I'm doing north side this week but I'll look into it..

I'll be doing 6:00am trips tomorrow if anyone wants to come ;)

edit: stupid point.. it has to be Walpole... duh!

yeah, how the route currently is.. he does a good job at fixing this problem! However, I'm not quite sure how the route looks because in 2010 it looks much differently.. I'm debating uninstalling 2010 and reinstalling 2006.... to see how the route really looks.. and I could easily install... Searchlight signals.. at all the correct points.. ;) It gets fun @ Walpole!
 
Last edited:
Back
Top