Japan

@ Rizky.
:D:D:D Fantastic. Unbelievable how fast you build. Did you ad catenary to the whole route? I mean yesterday those parts where almost bare. You have really a talent for this. :).
 
Current progress :
Catenary added from Tsurumi till Asano station and also Tokaido main line.
.
The next update maybe will be very slow caused by school activities. :sleep:







 
Current progress :
Catenary added from Tsurumi till Asano station and also Tokaido main line.
.
The next update maybe will be very slow caused by school activities. :sleep:

I'm really wowed by the progress. May I ask which type of track you use on the Tsurumi Line? I think it looks great :)
 
Man Rizky those Catenaries are awesome looking!! It must have been a pain trying to wire them all up. mainly over the crossovers. Will they be downloadable soon?
 
available DLS

JRH SHINKANSEN E4P consist <KUID:461543:100421>
JRH SHINKANSEN E4P 01 <KUID:461543:100413>
JRH SHINKANSEN E4P 02 <KUID:461543:100414>
JRH SHINKANSEN E4P 03 <KUID:461543:100415>
JRH SHINKANSEN E4P 04 <KUID:461543:100416>
JRH SHINKANSEN E4P 05 <KUID:461543:100417>
JRH SHINKANSEN E4P 06 <KUID:461543:100418>
JRH SHINKANSEN E4P 07 GreenCar <KUID:461543:100419>
JRH SHINKANSEN E4P 08 GreenCar <KUID:461543:100420>

JMA SHINKANSEN catenary 4track <KUID:461543:100423>
JMA NIPPON catenaryA 1track <KUID:461543:100430>
JMA NIPPON catenaryA 2track <KUID:461543:100427>
JMA NIPPON catenaryA 4track <KUID:461543:100426>
JMA NIPPON catenaryB 1track <KUID:461543:100436>
JMA NIPPON catenaryB 2track <KUID:461543:100425>
JMA NIPPON catenaryB 3track <KUID:461543:100432>
JMA NIPPON catenaryB 4track <KUID:461543:100424>
JMA NIPPON catenaryB 5track <KUID:461543:100428>
JMA NIPPON catenaryC 1track <KUID:461543:100431>
JMA NIPPON catenaryC 2track <KUID:461543:100429>
JMA NIPPON catenaryX 1track <KUID:461543:100435>
JMA NIPPON catenaryX 2track <KUID:461543:100434>
JMA NIPPON catenaryX 4track <KUID:461543:100433>

shinkansen-E4.jpg


My-Trainz-Screenshot-Image.jpg


My-Trainz-Screenshot-Image.jpg
 
Very nice that you adopted my repaint and made it better. The borders on the Ibis logo have disappeared which is very nice.
Also great to have new caternary. Thank you Hirochi :).
 
Current progress of Tsurumi line.

So, This is a pict of area around Tsurumi station in before and after.
I did some work detailing and also add some building around this area.

Before :


After :

.
.
.
]
 
Last edited:
Current progress of Tsurumi line.

So, This is a pict of area around Tsurumi station in before and after.
I did some work detailing and also add some building around this area.

Before :


After :

.
.
.
]

Once you see something like this there is only one word left:

AMAZING.
 
WOW!! that is some serious detailing there< Rizky. BTW, I downloaded your 4 track pack and there is a kuid missing. it's <kuid:501228:100345>.
Hirochi: Man oh man!! I can't thank you enough for the new Catenaries!! The Updated MAX Train looks pretty cool too!!
 
WOW!! that is some serious detailing there< Rizky. BTW, I downloaded your 4 track pack and there is a kuid missing. it's <kuid:501228:100345>.
Hirochi: Man oh man!! I can't thank you enough for the new Catenaries!! The Updated MAX Train looks pretty cool too!!

INCREDIBLE. I had to look twice if I was looking at a picture or not. Thats some incredible detail :udrool:.
 
WOW!! that is some serious detailing there< Rizky. BTW, I downloaded your 4 track pack and there is a kuid missing. it's <kuid:501228:100345>.
Hirochi: Man oh man!! I can't thank you enough for the new Catenaries!! The Updated MAX Train looks pretty cool too!!

Ah sorry, I forgot to upload. So here it is : DOWNLOAD
.
Also here some tracks and catenaries that i use for build the Tsurumi line : DOWNLOAD pass : kobayashi
 
Last edited:
Icarus Shinkansen V 2.0. progress.

Same spot as earlier but now more details. By the way. The cuteness factor for this train ( I believe the AN... by Hiroshi) it through the roof. :).

Also Started to use the new stations by Hiroshi. Took some time to setup due to the whole construction being a station in terms of signaling. But I have now full speed drive through and reasonable platform approach speed. Trains slows to 30 kph though. I cannot make it approach the platform @ 70 kph. I used invisible signals on the platforms though to prevent a yellow or red light on station approach. I did this by placing multiple signals on the end of the platform.

The Bridge Shot:

Now:

ICS0320171.png


In comparison with January 2017:

Icarus2017-1.png



Asadaka Minami Temple Park.

ICS0320172.png
 
Last edited:
Back
Top