I need a Guru on TS2010 file structure for this one.
 
I had a Win XP installation of Trainz 2010. All was good, and it worked OK, but was SLOW on my old P4 processor. It had a LOT of modified assets, mostly updated to work with TS2010 (or just to work in some cases).
 
I backed it up, not knowing that the binaries for the Trainz main apps were not compatible with my new, Phenom X6 system upgrade. Soooo, when the upgrade was completed and my old P4 was history, I copied it back onto my new fast hard drive, and, of course, nothing worked.:'(
 
I removed it and reinstalled TS2010, and then updated it to build 4408. All was good and happy. BUT...
 
My problem is now to get the modified assets, routes and sessions that I had built back onto the current version without CDP files. I have no way to run the old XP version anymore, but the scripts and other content are all present on the backup.
 
I need help to figure out how to transport them into the current build. There about 1180 modified assets, two routes and six sessions that represent about two years of work.
 
Is there anyone out there with absolute knowledge about how to do this?
				
			I had a Win XP installation of Trainz 2010. All was good, and it worked OK, but was SLOW on my old P4 processor. It had a LOT of modified assets, mostly updated to work with TS2010 (or just to work in some cases).
I backed it up, not knowing that the binaries for the Trainz main apps were not compatible with my new, Phenom X6 system upgrade. Soooo, when the upgrade was completed and my old P4 was history, I copied it back onto my new fast hard drive, and, of course, nothing worked.:'(
I removed it and reinstalled TS2010, and then updated it to build 4408. All was good and happy. BUT...
My problem is now to get the modified assets, routes and sessions that I had built back onto the current version without CDP files. I have no way to run the old XP version anymore, but the scripts and other content are all present on the backup.
I need help to figure out how to transport them into the current build. There about 1180 modified assets, two routes and six sessions that represent about two years of work.
Is there anyone out there with absolute knowledge about how to do this?