DESDICHATO
Member
Hi all,
I am testing out a route I've been building for a while and at the moment I have two runaway loco's going to opposite ends of the same job (coal mine to the left of the main line and power station to the right of the main line) I was wondering if I put them together and double headed them is it possible with the current AI to put the instructions for the rear loco and have it stay in place until it reaches the point where both loco's go there own way?????
Thanks
I am testing out a route I've been building for a while and at the moment I have two runaway loco's going to opposite ends of the same job (coal mine to the left of the main line and power station to the right of the main line) I was wondering if I put them together and double headed them is it possible with the current AI to put the instructions for the rear loco and have it stay in place until it reaches the point where both loco's go there own way?????
Thanks