Stewartbf6
New member
I have been working and learning on a copy of the Mojave sub. I 'repaired' and set up Monolith as a Coal loading with a power plant in Bakersfield, learning about signals, operations etc. I have setup a session that allows me to concentrate on switching industries and sending the assembled trains to a delivery point on sub or out a portal. That way I can Railfan when a Train goes by where I am working. These units are setup on session start or come from the portals. I jump around issuing driver commands to couple/move/load etc to switch engines.
Due to my situation, I am disabled, I spend hours 6+ on a session once I tweak all the navigate via instructions....now the problem
As the session winds down, trains are making it to the portals, the ones on the sub when session begins, not portal created, the rest start loosing their minds. Simple couple commands send the switch engine onto the mainline, navigate commands ignored with no messages, signals are run causing traffic to stop all over route,....chaos. I usually just stop and start over, but I would like to end my shift!! Anything I can do to remedy this issue?
Due to my situation, I am disabled, I spend hours 6+ on a session once I tweak all the navigate via instructions....now the problem
As the session winds down, trains are making it to the portals, the ones on the sub when session begins, not portal created, the rest start loosing their minds. Simple couple commands send the switch engine onto the mainline, navigate commands ignored with no messages, signals are run causing traffic to stop all over route,....chaos. I usually just stop and start over, but I would like to end my shift!! Anything I can do to remedy this issue?