A new Fictional CN Mainline from TrainzMI!
The Route is a Short Project and Starts in Glencoe runs thru Rochelle and on to Athens.
It Includes A heavy Traffic JCT at Rochelle(Rochelle JCT) It Has about 6 Railroads Crossing Each other at Rochelle Jct. They Are NS,CN,CSX,CMGN,CGLX,and CP.
The Route is still a Early WIP and I have not added any textures,trees, or switch levers. I am not sure if it will even make it off the Ground tough.
Now For Some Screenies of Rochelle JCT during Rush Hour......
A NS Coal Train Waits for its turn to Cross The CN/CP/CSX Mains and Back onto Home Rail. The New Signals Are Not in Place Yet.
The CGLX Athens Turn Starts to Cross the CN/CSX Mainlines after a CN Grain Crosses the CGLX Line, and the CSX Grain is Aproching the Diamonds as Well
CMGN Train 508 Waits to Drop its Oil Train in CN's Rochelle Yard. They are Waiting on the switch job to Assemble their Outbound Train
Thats all For Now
BDP
The Route is a Short Project and Starts in Glencoe runs thru Rochelle and on to Athens.
It Includes A heavy Traffic JCT at Rochelle(Rochelle JCT) It Has about 6 Railroads Crossing Each other at Rochelle Jct. They Are NS,CN,CSX,CMGN,CGLX,and CP.
The Route is still a Early WIP and I have not added any textures,trees, or switch levers. I am not sure if it will even make it off the Ground tough.
Now For Some Screenies of Rochelle JCT during Rush Hour......

A NS Coal Train Waits for its turn to Cross The CN/CP/CSX Mains and Back onto Home Rail. The New Signals Are Not in Place Yet.

The CGLX Athens Turn Starts to Cross the CN/CSX Mainlines after a CN Grain Crosses the CGLX Line, and the CSX Grain is Aproching the Diamonds as Well

CMGN Train 508 Waits to Drop its Oil Train in CN's Rochelle Yard. They are Waiting on the switch job to Assemble their Outbound Train
Thats all For Now
BDP