Bulk Asset Update/Replace

vovven47

Active member
Just started up my Surveyor 2.0 (Buildno 122127) and found that Bulk Asset Update/Replace tool is missing.
In classic Surveyor it is still there.


Question:
Will this tool be skipped in Surveyor 2.0 or is there an alternative method ?
 
Surveyor 2.0 is still incomplete. Bulk Asset Update/Replace is one of those Surveyor Classic tools that have yet to be implemented in S20. However, there is a limited object replacement option that can be found in the Context Menu of most/all selected objects.

Replace Object with Selected Asset - the selected (highlighted) object will be replaced with the asset currently selected in the Assets Palette. If no object has been selected in the Assets Palette or it is the wrong type (e.g. a scenery spline instead of a mesh object) then this option will be greyed out.

For example: You can select multiple track splines (Shift + Left Click to select individual track segments or Double Left Click to select them all up to the next junction), open the Context Menu of one of the spline objects and, provided a track spline asset has been selected in the Asset Palette, click the Replace Object with Selected Asset menu option. All the selected track object segments will be replaced with the selected asset.

A full Surveyor 2.0 tools reference guide and tutorial can be found on the Trainz Wiki at https://online.ts2009.com/mediaWiki/index.php/How_to_Use_S20_Tools
 
Back
Top