Hot_Box_Detector
Member
Hello all: I have read the tutorials ( I searched this forum and googled) & the Trainz manual, but still can't get my mind straight about using triggers for path control. I setup a one board test route using one siding and a main. I installed 2 basic industry objects. One supplies coal, located on the main track and the other consumes coal, located on the siding. I have 2 consists delivering coal. All I want to do is control the path of train 2 if train 1 is in the industry siding unloading coal.
When the siding is occupied by either train, I would like the other train to take the main track (or an alternate track) and wait until the industry siding is unoccupied then continue with its delivery.
If anyone can point me to a COMPREHENSIVE tutorial in ENGLISH, I would appreciate it.
Thanks, Durff
PS: I am using '04 but I assume '06 is the same.
When the siding is occupied by either train, I would like the other train to take the main track (or an alternate track) and wait until the industry siding is unoccupied then continue with its delivery.
If anyone can point me to a COMPREHENSIVE tutorial in ENGLISH, I would appreciate it.
Thanks, Durff
PS: I am using '04 but I assume '06 is the same.
Last edited: