3-4 way track, cabs, sounds, locos, non DLS.

there are several splines that are 3 or 4 tracked in the game... search uk in the track box and it should bring them up
 
http://www.auran.com/TRS2004/DLS.php Search-Name: Finescale

MB_finescale_quad_4m
Dependencies: MB_finescale_track

There also is a 5 track version ... search: Track, 5 x Wood

When applying a gradient, multi track splines will not raise, (if connected to a single track spline), if gradient is applied to the single track.

Multitrack and double track splines are geat for starightaways, but they make woop-dee-doo's swervies in curves and lead in's/leadouts. (Single tracks in curves, multitracks for straightaways).

If you change the alis kuid in the config file to, ie: MP_Wood v2, and that track will be displayed on YOUR route (but it will revert back to original finescale track on future downloaders or your route).

Try the cool track alignment tool 50 tracks 5m Also comes in(10-20-30-40 tracks) it has a wider 5m track spacing
 
Last edited:
Back
Top