I wanted to get a quick fact-check on something I'm doing with a few stations. I've been having a lot of trouble finding a good low-level platform station (preferably with an invisible platform) that's also long enough to handle, say, an Amtrak LD-type train (800+ feet). One solution I had was to take 2 existing 300-foot stations and place them end to end.
Does this work? If I tell an AI driver to stop at the farther station, will the train still load/unload at both?
Does this work? If I tell an AI driver to stop at the farther station, will the train still load/unload at both?