I am having an issue with the last few wagons derailing at points after passing a signal. Is there any particular distance a signal must be away from a set of points?
My layout is using TS2012. Size is approx 800km long. (Auckland to Wellington (North Island main trunk 650km) in New Zealand plus a few of the country lines i.e. Wellington to Palmerston North via Masterton). Both single and Double Line. When sending trains from Wellington north, trains are...
Does anyone have a list of "Automatic" Signals(as opposed to "Controlled"?
Or is it a setting in surveyor?
I have built a layout covering 650km about half of which is single track with multiple trains and am having trouble avoiding head on's etc.