I will start the 3rd version of the Trainz multiplayer session for build-in Mosti-Balezino.
It is a right-hand route with main and minor lines.
The main line is electrificated and has 2-side railways. It is 40 km length.
The minor line begins from the middle of the main, has one railway and is...