I'm trying to merge two maps in TS12 and am having a problem.
When I try to merge the two routes, only about 1/3 to 1/2 of the 2nd route gets merged. No error message, no crashing - it just stops adding baseboards.
Route A is about 1700 baseboards, Route B about 1500. Both are plain DEM terrain with Google Earth ground textures applied. No track or other objects. Route file sizes are 320MB and 380MB. I've tried merging A into B and B into A with the same results.
I read through this whole forum looking for posts about merge problems, but none seemed to match my problem.
I noted a technique used in TS2009 to make a 1 baseboard route, then merge into that. I did that and was able to merge Route A into the single baseboard route successfully. I saved and reopened that route. I then merged Route B and got the same problem. About 1/2 of Route B got merged this time instead of only about 1/3.
I moved the routes into TS2010 and got the same problem.
Is there a limit to the number of baseboards that can be merged? Or a file size limit? System runs XP with 4 gigs of memory. Drive has 300GB+ of free space.
The only thing I can think of is to split Route B into two smaller segments and try that. Before doing that, I thought I see if anyone has a better answer. If there is some sort of baseboard or file size limit, that'll be an issue as I have several more similar size sections to add.
Here is what I'm getting. Route A is on bottom, route B on top. As you can see Route B goes about halfway then just stops.
Thanks,
Todd
When I try to merge the two routes, only about 1/3 to 1/2 of the 2nd route gets merged. No error message, no crashing - it just stops adding baseboards.
Route A is about 1700 baseboards, Route B about 1500. Both are plain DEM terrain with Google Earth ground textures applied. No track or other objects. Route file sizes are 320MB and 380MB. I've tried merging A into B and B into A with the same results.
I read through this whole forum looking for posts about merge problems, but none seemed to match my problem.
I noted a technique used in TS2009 to make a 1 baseboard route, then merge into that. I did that and was able to merge Route A into the single baseboard route successfully. I saved and reopened that route. I then merged Route B and got the same problem. About 1/2 of Route B got merged this time instead of only about 1/3.
I moved the routes into TS2010 and got the same problem.
Is there a limit to the number of baseboards that can be merged? Or a file size limit? System runs XP with 4 gigs of memory. Drive has 300GB+ of free space.
The only thing I can think of is to split Route B into two smaller segments and try that. Before doing that, I thought I see if anyone has a better answer. If there is some sort of baseboard or file size limit, that'll be an issue as I have several more similar size sections to add.
Here is what I'm getting. Route A is on bottom, route B on top. As you can see Route B goes about halfway then just stops.
Thanks,
Todd