|
||||||||
|
|
|
#1
|
||||
|
||||
|
When i set up a train speed say at 80 kph the train only travels at 35-38 kph can anybody explain or help me with this ??? thank you
|
|
#2
|
||||
|
||||
|
Speed will depend on how far ahead the AI can see signals and if there is a train ahead.
If the signal ahead is not green then the train speed is reduced. Usually slower speeds means you have not placed signals correctly. Dennis |
|
#3
|
|||
|
|||
|
Hi
I have found that several things can cause Locos to run at half speed but the most common seems to be either incorrect signal placing or too much distance between signals - the Loco cannot read far enough ahead to verify a clear track. Hope this helps. Ron:rolleyes: |
|
#4
|
||||
|
||||
|
At start of a new session the train will travel at the default speed (40) until it passes speed boards then it will use the correct speed unless as said in previous replys the signals are red ahead of it.
|
|
#5
|
||||
|
||||
|
Quote:
assuming you're on a mainline with no branching out... just mainline track... how often would you want to place signals? |
|
#6
|
|||
|
|||
|
Yes, I would like to know about distances too
|
|
#7
|
||||
|
||||
|
Quote:
Good Questions, I'd like to add the following question, how can I make a section of track's speed limit higher then the 40MPH that seems to be the default?
__________________
This Message was posted on 100% recycled material. |
|
#8
|
||||
|
||||
|
Quote:
In France, it is an average of every 1.5km cheers |
|
#9
|
||||
|
||||
|
Thanks everybody for your help i will install more signal and see how i go weejock :rolleyes:
|
|
#10
|
||||
|
||||
|
Add a speedboard by the track and the speed will go to that. As well as those included there are many other types of speedboard on the DLS, including invisible ones.
__________________
Trainz 2006 SP1 Chief Engineer (and Bottle Washer) Waverley Line. |
|
#11
|
||||
|
||||
|
If the signal is green proceed at track speed, if it is yellow or sometimes orange proceed at half track speed.
(if the limit is 70, proceed at 35) If the signal is red, stop. Very simple. |
|
#12
|
||||
|
||||
|
Quote:
Thanks, I discovered that pretty soon after posting ![]()
__________________
This Message was posted on 100% recycled material. |
|
#13
|
||||
|
||||
|
I put in signal and that fixed it
|
|
#14
|
||||
|
||||
|
Quote:
click this PLEASE NOTE: this will be a long list so people please take your time to read this!!! Some of this could really help you out!!! If your find something about MaxSpeedPermented click it or add something to add it to rules!! Highlight the new rule and click edit read slowly and do as it saidNOTE one more time: this will make al trains go this speed the whole route! and or go into track side objects right beside track laying tool and click that is has a crossing sign and look for speed signs i never did this so good luck .Last edited by kcdowdy : April 18th, 2007 at 04:39 PM. |
|
#15
|
||||
|
||||
|
thank you kcdowdy for at least the productive part of your answer.
__________________
This Message was posted on 100% recycled material. |
![]() |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|