PDA

View Full Version : Is there a way to copy splines??


jankvis
March 5th, 2007, 05:35 PM
Let's say u have covered an erea with different splines (ex. plants etc.) Then u want to copy the hole area to another place on the map.

This is possible with non-spline items, like trees and buildings...but is there a tecnique to copy splines this way??

PLS reply ...

davidbird
March 6th, 2007, 04:54 AM
I'd be interested too, as I'm making a layout that is very similar to one I already have (unreleased) but mine will have real-world terrain heights and a different baseboard alignment. I'd like to simply copy-and-paste large areas of trackwork, but can't...
Anyway, this will allow me to set an email notification if anyone does reply...please!

jivebunny
March 6th, 2007, 06:57 AM
Hi All,

Short answer: can't be done I'm afraid.

Long answer: You can always delete all the baseboards except those you want to copy, save the leftover boards as a different route, and then merge this new route with your original one. This leaves you with two copies of the same baseboard(s) sat alongside eachother ;)

Cheers,

JB